Buenos Aires Metro

Buenos Aires Metro
Subterráneo de Buenos Aires


Top: A La Brugeoise car, rolling stock of Line A, at Perú Station.
Bottom: A Line H Orenstein & Koppel – Siemens-Schuckert train set at Caseros
Info
Owner Subterráneos de Buenos Aires S.E. (government corporation)
Locale Buenos Aires
Transit type Rapid transit
Number of lines 6
Number of stations 77[1]
Daily ridership 1.7 million + 2008
Website www.metrovias.com.ar
Operation
Began operation 1 December 1913
Operator(s) Metrovías
Technical
Track gauge 1,435 mm (4 ft 8 12 in) (standard gauge)
System map

The Buenos Aires Metro (Spanish: Subterráneo de Buenos Aires), locally known as Subte (Spanish pronunciation: [ˈsuβte], from subterráneo – 'underground' or 'subterranean') is a mass-transit system that serves the city of Buenos Aires, Argentina. The first station of this network opened in 1913, the first of its kind in South America, the Southern Hemisphere and the entire Spanish-speaking world. It is one of the busiest metro systems in the world.[2]

The network expanded rapidly during the early decades of the 20th century, but the pace of expansion fell sharply after the Second World War. In the late 1990s expansion resumed, with the planning of four new lines. However, the rate of expansion is largely exceeded by the transportation needs of the city and once again the network has become overcrowded.

At present, Buenos Aires is the only Argentine city with a metro system, but there is a project to build an underground system in the city of Córdoba (Córdoba Metro).[3]

Contents

History

Discussions on the need to build an underground transportation system in Buenos Aires began in the late nineteenth century, alongside the tramway system. They operated from 1870 and in about 1900 were in a crisis exacerbated by the monopolization of the companies, a process initiated against the electrification of the system.

In this context, the first proposals for the building of an underground system were made, along with requests for government grants: first, in 1886, and several more in 1889, but the Ministry of Interior (Ministerio del Interior, in Spanish) denied the city administration the power to license building in the subsoil of the City. For this reason, subsequent drafts were submitted directly to this ministry.

When in 1894 it was decided to construct the Congress building in its present location, the subway idea was revived, as it might shorten the travel time between the Casa Rosada and the Congress (with the same purpose there were also plans to build an electric aerial tramway to go down the Avenida de Mayo). Miguel Cané, former Mayor of Buenos Aires (1892–1893), also expressed in 1896 the need to build an underground railway similar to the one in London.

But the various projects failed to raise capital due, according to Miguel Cané, "the reluctance of the English to provide the necessary funds for the construction".

The first subway line was opened on 1 December 1913 and was built by the Anglo-Argentine Tramways Company (Compañía de Tranvías Anglo-Argentina (CTAA), in Spanish) , which had been given permission to build in 1909. That line was made up of one of the existing sections of line A, linking the stations of Plaza de Mayo and Plaza Miserere. On 1 April 1914 the line was expand to Río de Janeiro station and on 1 July was extended to Primera Junta Station.

In 1912 the company Lacroze Hermanos won a concession to build another subway line. This line is the current line B and was inaugurated on 17 October 1930. In 1933 the Hispano-Argentina Society of Public Works and Finance (Hispano–Argentina de Obras Públicas y Finanzas (CHADOPYF), in Spanish) began construction of the other subway lines.[4]

The entire network was centralised and nationalised during the late 1930s under the management of the Transport Corporation of Buenos Aires (CTBA), which in 1952 was absorbed by the Buenos Aires Transport General Administration (AGTBA).

In 1963, the administration was dissolved and the subway network became the property of the Subterráneos de Buenos Aires (SBA) company (later SBASE). In 1994 the service was privatised and is now managed by Metrovías S.A. with the stations remaining the property of SBASE.

Timeline

Date Opening(s) Closure
1913-12-01 Plaza de Mayo – Plaza Miserere
1914-04-01 Plaza Miserere – Río de Janeiro
1914-07-01 Río de Janeiro – Primera Junta
1930-10-17 Federico Lacroze – Callao
1931-07-22 Callao – Pellegrini
1931-12 Pellegrini – L.N.Alem
1934-11-09 Constitución – Diagonal Norte
1936-02-06 Diagonal Norte – Retiro
1937-06-03 Catedral – Tribunales
1940-02-23 Tribunales – Palermo
1944-06-20 San José – General Urquiza
1944-12-16 General Urquiza – Boedo (old)
1960-12-09 General Urquiza – Boedo (current) General Urquiza – Boedo (old)
1966-04-24 Boedo (current) – Av. La Plata
San José – Bolívar
1973-06-23 Av. La Plata – José María Moreno
1985-10-07 José María Moreno – Emilio Mitre
1985-10-31 Emilio Mitre – Medalla Milagrosa
1985-11-27 Medalla Milagrosa – Varela
1986-05-08 Varela – Plaza de los Virreyes
1987-12-29 Palermo – Ministro Carranza
1997-05-31 Ministro Carranza – José Hernandéz
1999-06-21 José Hernandéz – Juramento
2000-04-27 Juramento – Congreso de Tucumán
2003-08-09 Federico Lacroze – Los Incas
2007-10-18 Once – Caseros
2008-12-23 Primera Junta – Carabobo
2010-12-06 Once – Corrientes
2011-10-04 Caseros – Parque Patricios

Current Network

The current network comprises six underground lines, labelled "A" to "E" and "H" and which are further identified by different colours, covering a total track length of 52 km. There is also one surface PreMetro E2 light rail line. Daily ridership is 1.7 million[5] and on the increase. With the current usage patterns, the entire system is overstretched, and during weekdays overcrowded and with insufficient services. An expansion program is planned, and it is expected to enlarge the network to 97 km by 2011.[6]

Fares are cheap (ARS 1.10 (around USD 0.29) and are in fact cheaper than the city buses. While tokens have been used in the past, at present, riders purchase either single-use or multi-use cards (called SubtePass) with a magnetic strip or use Contactless cards called Monedero which can be rechargeable with cash or linked to a bank account for automatic debit. Trains run from 5:00 until 22:45, every 3–6 minutes, depending on the line considered.

Buenos Aires Metro Lines
Line Colour Date opening Original path Current termini Length /km Number of stations Daily passengers
Line A Light Blue 1913 Plaza de Mayo-Plaza Miserere Plaza de Mayo-Carabobo 8.5 16 190,000
Line B Red 1930 Federico Lacroze-Callao L. N. Alem-de Los Incas/Parque Chas 10.2 15 345,000
Line C Blue 1934 Plaza Constitución-Diagonal Norte Plaza Constitución-Retiro 4.5 9 278,000
Line D Green 1937 Catedral-Tribunales Catedral-Congreso de Tucumán 11.0 16 385,000
Line E Purple 1944 Plaza Constitución-Gral. Urquiza Plaza de los Virreyes-Bolívar 9.6 15 104,000
Line F* Maroon No official opening date Plaza Constitución-Plaza Italia** * 8.6** 13** *
Line G* Dark Orange No official opening date Retiro-Cid Campeador** * 7.3** 11** *
Line H Yellow 2007 Once-Caseros Corrientes-Parque Patricios 3.4 6 10,000
Line I* Orange No official opening date Plaza Italia-Parque Chacabuco** * 6.6** 9** *
* Planned lines

** Law 670 - Anex I.

Stations and connections

Stations are listed from East to West or North to South. Stations in gray have yet to open. Stations in bold are the current termini.


Line A
P. de Mayo - Carabobo

Line B
Leandro N. Alem - Los Incas

Line C
Retiro - Constitución

Line D
Catedral - C. de Tucumán

Line E
Bolívar - P. de los Virreyes

Line H
Corrientes - Caseros

Expansion plans

There are several projects to improve connections.[6]

Works in progress

Line A is under construction towards the west from Carabobo: 2 km with 2 stations: San José de Flores, San Pedrito (previously Nazca) (2010).
Line B is being extended underground further west (2 km) from Los Incas to Echeverría and Juan Manuel de Rosas where transfer to the Ferrocarril Mitre will be provided.
Line E extension from Bolívar to Retiro (2 intermediate station C.Central and Catalinas) started mid-2007.
Line H construction on the section Caseros – Hospitales began in early 2006.

Medium-term projects

Northern section connecting Corrientes to Retiro, has seven stations and is 3.8 km long.

New lines planned

The future expansion is based on the program Plan of New Lines: , and , whose routes are already approved by the Legislature of the City. 39.3 km km will be added to the network, expanding it to about 97 km in total length and provide several stations with various interchanges and include north-south routes to create an appropriate network to avoid the city centre. The new lines will mean that more than two million citizens of Buenos Aires, or about 70% of the city's population will live within 400m of a metro station. The new lines will be distributed over 56 new stations.

Line F will run from Barracas to Plaza Italia and will include 16 new stations. The planned route length of this line is 10.8 km.
Line G will connect Retiro and Villa Park; 12.5 km long with 15 new stations. Construction is expected to start in 2012.[7]
Line I will run Parque Chacabuco to Ciudad Universitaria with 18 new stations. The route length is 12.6 km.

Cultural Heritage

The Buenos Aires Metro has historically been characterized by murals and other artistic works in its stations, making a kind of museum throughout the system. These works, and a number of complete stations, are considered part of the cultural heritage of the city and several of them were declared National Historic Landmarks in 1997.[8]

Line A is world-famous because it still keeps its rolling stock running, making them the oldest subway coaches in commercial service in the world. They were built by La Brugeoise, et Nicaise et Delcuve, a Belgian rolling stock manufacturer established in the city of Bruges, between 1913 and 1919. Entirely made of wood, they were originally designed to run as subway as well as tramway cars, but they were adapted in 1927 to their current styling for underground service only. Since the 1940s, several plans have been made to replace them with newer rolling stock, but none of them has succeeded.[9]

Cultural stations

Many stations are decorated with intricate ceramic tile work, some of it dating back to 1913 when the subway first opened for business. Featured artists include painters and reproductions by Quino, Molina Campos, Raúl Soldi, Rodolfo Medina and Jorge Schwarz. In addition they provide spaces for music and theater events.

Line B
Line C
Line D
Line H

In popular culture

The subway is featured in the 1996 science fiction film Moebius directed by Gustavo Mosquera. In the film, the circumstances surrounding the disappearance of a metro train are investigated by a topologist. The film is based upon the short story, "A Subway Named Möbius" that takes place in the Boston Subway.[10]

PreMetro light rail

Main article: PreMetro

The PreMetro line E2 is a light rail system feeding the line E of the Buenos Aires Metro.

Urquiza Line

Main article: Urquiza Line

Línea Urquiza (in English: Urquiza Line) is a 25.5 km (16 mi) suburban electric commuter line originally designed to be part of the subway system, and operated by the subway operator Metrovías, in Buenos Aires, Argentina. It runs from the Federico Lacroze terminus in the barrio of Chacarita, to General Lemos terminus, Campo de Mayo in Greater Buenos Aires. The line is completely at grade (ground-level) and uses third rail current collection and, at present, is used by an average of 75,400 passengers daily and operates 20 hours a day, 7 days a week at 8 to 30 minute intervals.

In earlier times the line was planned to run into the centre of Buenos Aires through a long tunnel. But when the tunnel was finally built in 1930, it ended up as the B line subway, so that suburban passengers had to change at Federico Lacroze, named after its builder, about 6 km (3.7 mi) from the centre.

See also

Buenos Aires portal
Argentina portal
Trains portal

References

  1. ^ a b "Metrovías en Números". Metrovias. http://www.metrovias.com.ar/V2/MetroviasNumeros.asp?op=11&Item=3&Lang=. Retrieved 2011-08-17. 
  2. ^ Mustafayev, Nicat (29 June 2009). "World metro systems by annual passenger rides". http://en.apa.az/news.php?id=104441. Retrieved 9 July 2009. 
  3. ^ Diario La Voz Del Interior
  4. ^ www.clico.com.ar Antecedentes, Inicios, Desarrollo de la red y Líneas (Spanish) Retrieved 2010-11-03
  5. ^ www.rieles.com Subte Récord: Ya transporta 1.7 Millón de pasajeros por día (Spanish) Retrieved 2010-11-12
  6. ^ a b www.railway-technology.com Buenos Aires Subway Extensions
  7. ^ "Railway Gazette: Urban rail news in brief". http://www.railwaygazette.com/nc/news/single-view/view/urban-rail-news-in-brief-12.html. Retrieved 2011-05-15. 
  8. ^ Historical National Monuments (Spanish)
  9. ^ BusARG.ar (Spanish)
  10. ^ "A subway named Möbius"

External links